Abstract
We study scheduling problems in battery-operated computing devices, aiming at schedules with low total energy consumption. While most of the previous work has focused on finding feasible schedules in deadline-based settings, in this article we are interested in schedules that guarantee good response times. More specifically, our goal is to schedule a sequence of jobs on a variable-speed processor so as to minimize the total cost consisting of the energy consumption and the total flow time of all jobs. We first show that when the amount of work, for any job, may take an arbitrary value, then no online algorithm can achieve a constant competitive ratio. Therefore, most of the article is concerned with unit-size jobs. We devise a deterministic constant competitive online algorithm and show that the offline problem can be solved in polynomial time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.