Abstract

This update of the Energy Economic Data Base is the latest in a series of technical and cost studies prepared by United Engineers and Constructors Inc., during the last 18 years. The data base was developed during 1978 and has been updated annually since then. The purpose of the updates has been to reflect the impact of changing regulations and technology on the costs of electric power generating stations. This Phase VI (Sixth) Update report documents the results of the 1983 EEDB Program update effort. The latest effort was a comprehensive update of the technical and capital cost information for the pressurized water reactor, boiling water reactor, and liquid metal fast breeder reactor nuclear power plant data models and for the 800 MWe and 500 MWe high sulfur coal-fired power plant data models. The update provided representative costs for these nuclear and coal-fired power plants for the 1980's. In addition, the updated nuclear power plant data models for the 1980's were modified to provide anticipated costs for nuclear power plants for the 1990's. Consequently, the Phase VI Update has continued to provide important benchmark information through which technical and capital cost trends may be identified that have occurred since January 1, 1978.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call