Abstract

In recent years, the topic of sustainable manufacturing system design with energy saving features has received increasing attention. For a typical production line setting, the machines are subject to random breakdown and restart besides blockage and starvation, and they are usually connected via buffer areas with finite capacity. In the present study, the energy consumption of the serial production line with two Bernoulli machines is considered, with an aim to minimise the total energy consumption under a desired production rate. The energy consumption of the two-machine system is composed of the energy needed to setup, to remain idle, and for actual manufacturing. In order to minimise the total energy expenditure, a nonlinear fractional polynomial optimisation model is constructed, which is first converted to a nonlinear polynomial optimisation problem. Then the property of the total energy cost is analysed via the sum of squares (SOS) method. To speed up the solving process, a new heuristic approach named energy consumption saving (ECS) algorithm is proposed considering the monotonicity and local optimality of the energy cost function. Finally, by presenting optimal configurations of the production line with different throughputs, buffer capacities, and energy parameters, a simulation-based study is performed to validate the SOS and ECS algorithms.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call