Abstract

Pulverizing system is the main energy-consumption equipment in coal-fired power plant, so it is of great significance to study energy-saving and optimization of pulverizing system. This paper first analyzes the situation and condition of pulverizing system in large-scale coal-fired power plant in China. According to analysis, coal mill and primary-air fan are the two main energy consumption facilities. Then their energy consumption characteristics, including power consumption and unit power consumption are studied. Subsequently, the energy-saving operation proposal for the pulverizing system is proposed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call