Abstract

A number of pillars are left developed in some of the Chinese metal mines due to careless mining and lack of proper planning. There are pillars in such mines which do not contribute much in supporting the covered rock mass. Re-exploitation of these standing (non-supporting) pillars can be an efficient method for resource recovery if the remaining pillars ensure the stability of the covered host rock. In this study, a tungsten mine in Jiangxi Province, China, was chosen as a case for studying this pillar recovery scheme. Based on accurate in situ stress measurement data in the original and disturbed host rock, the storage energy in the rock mass could be estimated by numerical simulation methods. After comparing the storage energy to the sum of the fractured energy consumption and friction energy consumption (obtained from lab tests), the recyclable pillars can be identified by a cyclic judgment programming process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.