Abstract

Once the 456 MW Upper Tamakoshi Hydroelectric Project is commissioned by the end of 2018, Nepal is expected to have surplus energy during the wet/monsoon season of 2019. Nepal’s Energy Ministry has decided to resolve this surplus issue through Energy Banking with India whereby Nepal exports her wet season power for India’s dry season import on “the same volume”. This is an extremely naïve assumption even if it is for the sake of mere negotiation. Discussing the short-sightedness of Energy Banking concept, this article stresses that Nepal should have, instead, activated the other two prevailing instruments of power trading, that of bilateral and regional 2014 Indo-Nepal Electric Power Trade, Cross-Border Transmission and Grid Connectivity Agreement and the 2014 SAARC Framework Agreement for Energy Cooperation (Electricity) respectively. Activating these two agreements would have ‘Open Sesame’-d the doors to Nepal’s growing hydropower capabilities – a win-win situation for both countries. HYDRO Nepal JournalJournal of Water, Energy and Environment Issue: 23Year: 2018

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.