Abstract

We consider the problem of energy aware scheduling of a set of jobs on a set of unrelated parallel machines with the average weighted completion time plus energy objective. The processing time and the energy consumption of the jobs are machine and speed dependent. Also, every job is subject to a machine-dependent release date. Firstly, we aim to find a non-preemptive schedule of the jobs minimizing the average weighted completion time plus energy, and we propose a randomized approximation algorithm that we derandomize obtaining a deterministic approximation algorithm. We then consider the budget variant of the problem where the objective is to minimize the average completion time while the total energy consumption does not exceed a given budget.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.