Abstract

This paper presents an adjustable interval optimization model for the energy and reserve clearance while treating the wind power variation and uncertainty. Instead of conventional predicted intervals (PIs), adjustable intervals (AIs) as subsets of PIs are proposed as more judicious choices for economically covering wind uncertainties. Ramp-capability reserve is modeled to ensure the existence of sufficient ramp capability needed to follow up wind power variation within AIs. However, realization of wind power beyond AIs, which is no longer compensable by ramp-capability reserve, would necessarily lead to either load shedding or wind spillage. In order to optimally determine AIs, apart from the energy and reserve procurement costs, the costs associated with load shedding and wind spillage are incorporated in the objective function. The confidence level theory is employed as well for tuning the robustness and conservatism of the final solution. Performance of the proposed method is examined on several case studies on an 8-bus and modified IEEE 118-bus test systems. Sensitivity analyses are conducted to specify the impacts of important parameters on the obtained solution. The results confirm the applicability and effectiveness of the proposed methodology.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.