Abstract
The ENEL (Italian State Power Board) PGTC System has a multi-level architecture which consists of a National Control Center (NCC), eight Area Control Centers (ACC), and Remote Terminal Units (RTU). Remote Control Centers (RCC), representing the third hierarchical level of the control system, will be integrated into the system beginning in 1987. This paper describes the structure of the PGTC system from the remote stations up to the NCC and the main control functions. The method of implementation, the organizational and managerial problems that were faced in the development of the project are also described.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.