Abstract

WirelessHART is a new standard specifically designed for real-time and reliable communication between sensor and actuator devices for industrial process monitoring and control applications. End-to-end communication delay analysis for WirelessHART networks is required to determine the schedulability of real-time data flows from sensors to actuators for the purpose of acceptance test or workload adjustment in response to network dynamics. In this paper, we map the scheduling of real-time periodic data flows in a WirelessHART network to real-time multiprocessor scheduling. We then exploit the response time analysis for multiprocessor scheduling and propose a novel method for the delay analysis that establishes an upper bound of the end-to-end communication delay of each real-time flow in a WirelessHART network. Simulation studies based on both random topologies and real network topologies of a 74-node physical wireless sensor network testbed demonstrate that our analysis provides safe and reasonably tight upper bounds of the end-to-end delays of real-time flows, and hence enables effective schedulability tests for WirelessHART networks. Type of Report: Other Department of Computer Science & Engineering Washington University in St. Louis Campus Box 1045 St. Louis, MO 63130 ph: (314) 935-6160

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.