Abstract
In power systems with high shares of variable and limitedly predictable renewables, power system operators need to schedule flexible load, generation, and storage to maintain the power system balance when forecast errors occur. To ensure a reliable and cost-effective power system operation, novel reserve sizing and allocation methods are needed. Although stochastic formulations of the unit commitment (UC) problem allow calculating an optimal trade-off between the cost of scheduling and activating reserves, load shedding and curtailment, these models may become computationally intractable for real-life power systems. Therefore, in this paper, we develop a novel set of probabilistic reserve constraints, which allows internalizing the reserve sizing and allocation problem in a deterministic UC model, considering the full cost of reserve allocation and activation. Extensive numerical simulations show that this novel formulation yields UC schedules that are nearly as cost-effective as the theoretical optimal solution of the stochastic model in calculation times similar to that of a deterministic equivalent.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.