Abstract

WirelessHART, as a robust and reliable wireless protocol, has been widely-used in industrial wireless sensoractuator networks. Its real-time performance has been extensively studied, but limited to the single criticality case. Many advanced applications have mixed-criticality communications, where different data flows come with different levels of importance or criticality. Hence, in this paper, we study the real-time mixedcriticality communication using WirelessHART protocol, and propose an end-to-end delay analysis approach based on fixed priority scheduling. To the best of our knowledge, this is the first work that introduces the concept of mixed-criticality into wireless sensor-actuator networks. Evaluation results show the effectiveness and efficacy of our approach.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.