Abstract

A no-blame culture is widely accepted as a collaboration driver yet we see surprisingly scant literature on the theoretical underpinnings for the construction and project management context. A no-blame culture in project alliances, as conducted in Australasia, promotes innovative thinking in action. Innovation is dependent upon collaboration and true collaboration is inextricably linked with behavioural drivers. Foremost of these is a culture of openness and willingness to share the pain and gain from experimentation, one that requires that collaborators be protected from the threat of being blamed and held accountable for experimental failure. The Australasian project alliance procurement form has a unique ‘no-blame’ behavioural contract clause that can result in the type of breakthrough thinking crucial in developing a collaborative culture where innovation can evolve through a process of trial and error.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call