Abstract

AbstractFragmentation is a well-known problem in the construction field; however, the literature shows a lack of a precise definition and appropriate measurement of this notion. The purpose of this paper is to determine indicators of fragmentation in construction projects using a second-order formative measurement model. The data were collected using a questionnaire survey from big building projects in Malaysia. Three procedures were used to analyze the data. First, we used principal component analysis (PCA) to determine fragmentation constructs and develop the hierarchical model. Second, partial least squares-path modeling (PLS-PM) was conducted to analyze the hierarchical model and validate the constructs. Lastly, a multicollinearity test was performed to validate the formative variables. The results indicated four new constructs of fragmentation, namely: integration, spanning knowledge across boundaries, barriers, and decoupling of diversity. This paper contributes to the development of a new definitio...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.