Abstract

The Tennessee Valley Authority (TVA), created by Act of Congress in 1933, has responsibility for generating electricity, providing flood control, and promoting agricultural and industrial development for the Tennessee Valley. In the generation of electricity, TVA initially developed extensive hydroelectric facilities throughout the valley and, subsequently, extensive fossil and nuclear facilities. In the changing regulatory and economic environment associated with electricity generation, TVA has created the Public Power Institute (PPI). The PPI has responsibility for advancing energy generation and pollution reduction; it has responsibility for renewable energy development. In carrying out its renewable energy commitment, the PPI extends the leadership in biomass cofiring started in 1992, with studies and testing performed in cooperation with the Electric Power Research Institute at such locations as the Kingston Fossil Plant and the Allen Fossil Plant. It extends the activities associated with using tire-derived fuel at the Allen Fossil Plant. Through the PPI, TVA will continue to take a leadership role in the development of biomass systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.