Abstract

The project of transporting water to Dalian in urgent situation is a large-scale Inter-basin water transfer project, which in order to solve the serious problem of the shortage of water in Dalian. It is a key construction project in Liaoning province project, which will cost huge investment and need spending long construction period. Dalian is of great shortage of water resource, it's water supply depends on the Largescale water conservancy project. In order to provide reference to investment and construction of similar project in the future, this paper use the benefit factor analysis and set a model, to analyze the factors, such as economic, social impact, environmental impact. If the construction and use of the funds put into operation, we concluded that the construction of the project was reasonable in economy. The construction of this project will solve water shortage problems periodically and play a significant role in the future of urban development in Dalian.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.