The phase from the design to the operation of tunnels for railbound public transportation systems proves to be extremely protracted in practice. This is due to the necessary approval procedures and extremely different appraisals pertaining to safety for instance. The design phase can be appreciably reduced if a standard emergency scenario is presented, for which a suitable safety concept must be available. Experts then decide on the case of fire as a standard scenario from possible emergency scenarios by dint of which the required safety considerations are to be carried out for new structures so that a standard basis for planning is created in Germany. The principal approach is shown for example for designing underground stations so that persons can rescue themselves and be rescued through establishing short evacuation periods and long smoke proliferation periods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.