Abstract

Aceralia blast furnace A suffered a 28-days emergency repair in September 2004, due to accelerated wear of the hearth walls and severe damage of the cast iron staves at the bosh area. Considering the shortage of supplies, Aceralia resorted to non conventional repair methods in order to prolong the campaign by one year, until full relining: small format carbon bricks and carbon ramming mass for the hearth and tapholes and steel staves at the bosh.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.