Abstract

The embankment going to Dordogne Viaduct crossed by the LGV South Europe Atlantic SEA is based on 4 000 semi-rigid inclusions (CMC) designed in accordance with ASIRI. Published in 2012, these recommendations are starting to be well known and applied around the world. Depending on the purpose of the CMC (stability or only settlement reduction), CMCs justifications differ. For the first case, verifications are more numerous and more severe. After CMC ground improvement work in 2013, the embankment had been performed and the rail is being installed. A monitoring setting up during project progress has allowed the comparison between predicted deformations and measurements.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.