Abstract

With the rapid modernization of China’s infrastructure construction, disposal of the massive amount of construction and demolition waste (CDW) produced each year has gradually developed into a national concern due to its increasingly adverse effect on the environment. Additionally, in northwestern China, ground deformation triggered by collapsible loess has caused severe damage to local infrastructure. In an attempt to address both problems simultaneously, this paper proposes the novel approach of applying CDW as a pile filler for the down-hole dynamic compaction. The concept, construction process, and design principles of this new method are described, and its efficiency and feasibility are validated in detailed studies of four practical cases in different locations in China. Problems that arise in certain aspects of this method, i.e., code revision with consideration of the variable loess conditions and CDW in different locations, are also discussed. Case studies and relevant discussions indicate a promising future for this environmentally friendly and eco-efficient method that is broadly applicable in many locations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.