Abstract

This paper presents an open-loop control algorithm for multi-active bridge dc-dc converters, that provides a fast settling time within one half of a switching period. Furthermore, the control algorithm prevents undesired dc-bias components in the current waveforms and does not require any system parameters or measurements. The open-loop control algorithm can be combined with arbitrary closed-loop control algorithms to compensate disturbances. The first section of the paper deals with the generalized derivation of the equations for an arbitrary number of ports followed by simulative validation in the second section. Subsequently, influences of the dead time are investigated in the third section. A methodology for compensating the effects of dead time is presented and validated by simulation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.