Abstract
The electron capture processes in collisions of Li3+ ion with Li(1s22s) and Li(1s22p0,1) are investigated by using the two-center atomic orbital close-coupling method in the energy range from 0.1 keV/u to 300 keV/u. The interaction of the active electrons with the target ion is represented by a model potential. The present results for the Li3+–Li(1s22s) system are compared with the available theoretical data and general agreement is obtained for the high collision energies. It is also found that the total and partial electron capture cross sections are sensitive to the initial charge cloud alignment in the low energy region.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.