Abstract
For approximately four years after completion of Gettysburg Air Force Station in 1955, personnel assigned there shunned consumption of the water supply because of its unusually high salt content. In 1959, an electrodialysis water demineralization plant was put into operation which caused these residents to switch from bottled beverages to water. This was the first plant of its type to be constructed in the midwest. Design and construction was under the direction of the US Army Corps of Engineers, Omaha District Office, Omaha, Nebraska. This article presents general design considerations and operational data from over three years of operation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.