Abstract

A deep-level tube railway with high traffic density has special requirements; also an interruption to any of the main or auxiliary services can be very serious. The present London Underground system, resulting from an amalgamation of separate undertakings, provides a tribute to the sound design and workmanship of the early equipment

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.