Abstract

The industrial sector consumes half of the world delivered energy and is responsible for a third of carbon dioxide emissions which cause severe environmental pollution. The industry has to change its behaviour concerning the energy consumption. Since two-machine flow shop scheduling () is one of the typical problems of the manufacturing industry, this paper aims to build an energy-cost-aware scheduling plan. This work tackles the joint optimisation of makespan and electricity cost in two-machine flow shop scheduling problem under electricity pricing. We enhance the financial aspect of the optimal solution of by minimising the electricity cost without increasing the makespan. Firstly, we show the contribution of the generation of several optimal equivalent solutions of . The optimal equivalent solutions have different electricity costs but present the same makespan. Then, we determine the optimal starting time of jobs on several equivalent optimal solutions to get the best production plan. Finally, the numerical tests show that our proposed approach improves the electricity cost significantly under optimal makespan. The results provide good solutions to managers and decision makers to achieve energy cost savings without sacrificing the productivity which can contribute to sustainable development of the manufacturing industry.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.