Abstract
Since the design practices described in this paper are numerous, wide in scope, and briefly dealt with, the material can be abstracted only by enumerating the subjects treated. Included under "POWERHOUSE" are: turbine-generators, generator bus, control and instrumentation, protective relaying, data logging, annunciation, communications, station service power, vital a-c power, motors, batteries, cable, cable trays, and conduit. "SWITCHYARD" includes main power transformers, general arrangement, insulation levels, and grounding. "COAL HANDLING" covers power supply, control, and instrumentation. The material presented will provide to the electric power industry, for the purpose of comparison or duplication, the current design practices developed for very large generating units in a major power system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.