Abstract

The risk of electric power supply and demand is becoming more and more outstanding. So in order to avoid electric power supply and demand risks, we should set up the electric power supply and demand early warning management system. In this paper, the influencing factors of electric power supply and demand are analyzed, and then the principal component analysis method is used to reduce factors, then the support vector machine method is used to realize the early warning of the electric power supply and demand. At last, it is validated that the results by this method is feasible for early warning.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call