Abstract
A method of analysis is presented for the consilidation of a linear elastic soil due to the cutting of a long and deep circular tunnel. Solutions have been obtained for the time dependent displacements and stress changes occurring in the soil surrounding the tunnel opening.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have