Abstract
Steel-concrete composite beams are widely used in practice because of their simple construction sequence and economic cross-section design. Reuse of traditional composite beams is not possible due to the permanent connection between the steel beam and concrete deck established by welded headed studs. To allow for fast construction, demountability and reuse of composite beams, various demountable shear connectors can be used. In this paper the results of experiments carried out on demountable and reusable tapered composite beams, consisting of a tapered steel beam and large-scale prefabricated concrete decks, are presented. The performance of various arrangements of resin-injected bolt-coupler shear connectors was considered to optimize the beneficial effect of composite action whilst minimizing the number of shear connectors. An advantage of resin-injected bolted shear connectors is that composite action is obtained instantaneously and simultaneously for all connectors. Demountability and reusability of the composite beam were successfully demonstrated experimentally. Experimental and numerical results indicated that the number of shear connectors necessary to fulfil deflection and end-slip limits can be reduced by concentrating them near the supports of a simply-supported beam. Results obtained using finite element models closely matched the experimental results in terms of deflection, stresses and curvature.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.