Abstract

The legal literature distinguishes between the liquidated damage and the penalty clauses in contracts, and holds that penalties designed for the prevention of breach are excessive compared to the liquidated damages. In an efficient supply chain contract, the penalty must satisfy the participation and incentive compatibility constraints of the signatories. Considering loss-averse players, we have calculated optimal penalties in a supply chain contract and compared those with the liquidated damages. Two possible breaches are considered – a breach in quality of the delivery and a breach in the process. In the absence of any penalty, a process breach reduces the supplier’s delivery risk and cost of delivery. Determining the parametric conditions for efficient contracts, numerically we show the effects of various variables on the zone of efficient contract. We show that the optimal penalties need not be excessive compared to the liquidated damages.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.