Abstract

Tunnel surveying requires fast and accurate data processing because a tunnel excavation pattern and its work sequences are dependent on the surveying result in the field. While a total station is widely used for measuring reference points in tunnel projects, the data from the total station are too limited in implementing some of the functions required for project control. Recently, three dimensional (3D) laser scanners have been tested in some tunnel projects, because they generate high-density data within several minutes. On the other hand, software development to facilitate processing the resulting large dataset is essential for its wide adoption on tunnel projects. The authors propose efficient data processing algorithms to accelerate continuous data processing and to facilitate downsizing data points, considering the characteristics of tunnel projects using The New Austrian Tunneling Method (NATM).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.