Abstract

In this paper, an unrelated parallel machine scheduling problem with sequence and machine-dependent setup times and makespan minimization is studied. A new makespan linearization and several mixed integer formulations are proposed for this problem. These formulations outperform the previously published formulations regarding size of instances and computational time to reach optimal solutions. Using these models, it is possible to solve instances six times larger than what was previously solved and to obtain optimal solutions on instances of the same size up to four orders of magnitude faster. A metaheuristic algorithm based on multi-start algorithm and variable neighbourhood descent metaheuristic is proposed. Composite movements were defined for the improvement phase of the proposed metaheuristic algorithm that considerably improved the performance of the algorithm providing small deviations from optimal solutions in medium-sized instances and outperforming the best known solutions for large instances.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.