Abstract
Due to the complexity of the production process, short-term scheduling for refineries is one of the most challenging problems. To address large-scale industrial refinery scheduling problems, a spatial Lagrangian decomposition approach is proposed to decompose the whole problem into several production processing subproblems and one blending and delivery subproblem. Some auxiliary constraints are added in the subproblems to accelerate the convergence of Lagrange multipliers. An initialization scheme of Lagrange multipliers, a hybrid method to update the Lagrange multipliers, and a heuristic algorithm to find feasible solutions are also designed. Computational results on three cases with different lengths of time horizons and different numbers of orders show that the proposed Lagrangian scheme is effective and efficient.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.