Abstract
Many dispatching rules for scheduling in dynamic jobshops have been proposed over many years. The research issues in jobshop scheduling seem to be still open in the sense that no single rule has been found to be the best under all shopfloor conditions even with respect to one single measure of performance. Added to this problem, there are several measures of performance, e.g. the minimizations of mean, maximum and variance of flowtime, percentage of tardy jobs, and mean, maximum and variance of tardiness of jobs. Recent studies have reported the development of more efficient dispatching rules than the popular rules, e.g. SPT, COVERT, MOD and ATC. This study is an attempt to improve some of the recently reported dispatching rules. An extensive simulation study reveals that the improved rules developed in the present study appear to be quite effective in minimizing mean flowtime, and maximum tardiness and variance of tardiness of jobs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.