Abstract

Taiwan's semiconductor integrated circuit (IC) industry plays an important role in the world and has maintained a major market share, especially, in the business of IC's packaging and testing. In the past, many studies have discussed job-release models for upstream IC manufacturing, but few emphasize on the IC turnkey factory, which including IC assembly and testing operations. In this paper, a job-release strategy for an IC turnkey factory with known assembly cycle time will be proposed. Concerning objectives under limited-capacity resources are (1) increasing the overall equipment efficiency (OEE) of IC test equipments, (2) reducing the fabrication cycle time, and (3) increasing the on-time delivery (OTD) rate. A genetic algorithm (GA) is applied to obtain an efficient job-release plan based on the data of an IC turnkey factory in Taiwan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.