Abstract
We propose an efficient heuristic algorithm for two-stage hybrid flowshop scheduling with sequence-dependent setup times. In the past, metaheuristic approaches, which usually need long time, have been mostly used for the problem. In this study, due to practical reasons of the application that we consider, we need to obtain the solution of the problem within a reasonably short computational time, even for large-sized problems. In this study, we devise the proposed algorithm as a hybrid of two methods, that is, the beam search and NEH method, and we compare the performances with other existing local search methods. The results of the computational experiments show that the proposed algorithm solves the problems in a relatively shorter computation time, while the scheduling performances are superior to the existing methods.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.