Abstract

This paper proposes a heuristic algorithm for integrated scheduling of refinery production unit operations and finished product blending and delivery operations. To apply the proposed iterative algorithm, the integrated oil-refinery scheduling problem is decomposed into a production unit scheduling problem and a finished product blending and delivery scheduling problem. The goal of the algorithm is to obtain a feasible solution that satisfies product demand commitments with minimum demurrage violations while minimizing run-mode changeover cost, inventory cost, and penalties subject to product and logistics giveaways. The proposed algorithm provides a feasible solution at the end of each iteration, and to obtain solution without demurrage violations, a set of integer cuts are generated at the end of an iteration to eliminate current task assignment sequence for a multipurpose blend unit. The applicability of the algorithm is illustrated by a realistic large-scale refinery case study producing diesel and jet fuel. Significant savings are realized in the computational effort.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.