Abstract

Moldable tasks allow schedulers to determine the number of processors assigned to each task, thus enabling efficient use of large-scale parallel processing systems. We consider the problem of scheduling independent moldable tasks on processors and propose a new perspective of the existing speedup models: as the number p of processors assigned to a task increases, the speedup is linear if p is small and becomes sublinear after p exceeds a threshold. Based on this, we propose an efficient approximation algorithm to minimize the makespan. As a by-product, we also propose an approximation algorithm to maximize the sum of values of tasks completed by a deadline; this scheduling objective is considered for moldable tasks for the first time while similar works have been done for other types of parallel tasks.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call