Abstract

In semiconductor manufacturing, a process module (PM) failure in cluster tools (CTs) happens from time to time. To effectively operate a CT, such a failure should be handled in a proper and timely manner. This issue becomes much more complicated because wafer residency time constraints (WRTCs) must be met to ensure the quality for some wafer fabrication processes. With such constraints, if a tool is operated under a periodic schedule and a PM fails, it is desired that the tool can still operate under a periodic schedule if it is possible. Nevertheless, the periodic schedule after a PM failure must be different from that before its failure since in this case the tool is degraded. Thus, there must be a transient process between them. It is a great challenge to operate a tool such that it can go through such a transient process with WRTCs being always satisfied. This paper aims to solve this problem by proposing PM failure response policies which can successfully transfer a CT to the feasible schedule after failure from the one before a failure. Then, efficient algorithms are developed to improve these response policies. The proposed policies are composed of simple control laws such that they can be realized in real time and online. Illustrative examples are presented to show their applications.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.