Abstract
In the past - 300ft Leg Jack-Up Rig predominantly used to Drill and Complete wells. In depleted phase currently, MH field is witnessing dominantly well work-over / repair scope to sustain production. Seabed inconsistencies caused by pug marks left by previous Jack-Up rigs and sea-bed pipe line network hinder Jack-Ups to approach platform and rework wells. Specificity of Jack-Up Rigs to approach Specific Platforms due to signature pug-marks left behind Increase in market demand for large Jack-Up rigs, increased day rates to very high levels. Above technical and economic compulsions drove decision making and acceptability to consider modular rigs over other alternatives. In order to ensure optimum performance of your rig, reduce downtime and maintain safety of your personnel, planned maintenance and accurate inspections are essential. Drilling's Rig Inspection Workshop (RIW) teaches the inspection and maintenance procedures required to ensure equipment integrity onland rigs, platform rigs and jack-up rigs. Candidates learn to implement the relevant standards and understand industry requirements so that they can verify the condition of a rig's equipment and improve safety, thus reducing the number of accidents and protecting the asset.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.