Abstract

The article gives the reasons of occurrence and origin of defects of railroad track structure elements on approaches to bridges. The defects arising on sleepers and intermediate fasteners of the track structure and the costs obtained as a result of early replacement of the track structure elements on the transition sections are calculated. As a result of the received constructive decision the technological process of driving of reinforced concrete piles in an embankment for the purpose of maintenance of safe and reliable work of sleepers and intermediate fastenings during service life in 3 m on a transition section is developed. As a result of implementation of the developed design in 1384 transition sections, the economic efficiency amounted to 447.638 million sums. As a result of reinforcement of the transition section, the cost of current and lifting repair of the track is reduced.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.