Abstract
The thermal and overall efficiency of the third unit in the Al-Khoums steam power plant were investigated in this paper. Two samples of data have been used: the first was collected from the start-up data sheet of the power plant with a load of 120 MWH, and the second was collected in June 2023 with a load of 96 MWH. This study reveals that the thermal efficiency of the unit decreased by 9.4% (from 40.4% to 36.6%) due to the life of the plant and the stoppage of extraction lines, and the overall efficiency decreased by 8.7% (from 36.7% to 33.5%). Moreover, heat rejected by the condenser increased in the second sample by 44 kJ/kg. Steam cycles for both study samples were presented by T-S diagrams using Engineering Equation Solver software (EES), and it was clear from those diagrams that the efficiency of the high-pressure turbine in the first sample is higher than the second one.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.