Abstract

Seepage always eventuates through the foundation of all dams. The flow of water through the dam body generate seepage forces and endanger the dam stability due to piping. Controlling seepage after construction is quite difficult and an expensive job, hence proper practices should be adopted for seepage remediation in the designing stage. In order to investigate the more effective techniques among downstream (D/S) sand filter with upstream (U/S) clay blanket and cut-off wall, the Baz Ali small dam was analyzed using finite element approach SEEP/W 2D. The seepage behaviour through the dam was intuited by employing 1 m thick clay blankets on the upstream side with extending lengths of 50 m, 100 m, 150 m, 200 m, 250 m and 300 m. Furthermore, 5 m, 7.5 m and 10 m deep cut-off walls having 0.5 m and 1 m thickness were embedded for seepage mitigation. The seepage values obtained from SEEP/W 2D models were compared with each other. The SEEP/W 2D results and cost analysis show that clay blanket is more effective and an economical technique than a cut-off wall for tackling seepage issue. Hence, an upstream blanket of 100 m length is more efficient to diminish the seepage up to 58.65% in contrast to the base case without the remedial system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call