Abstract

The supercritical power plant analyzed in this paper consists of the following elements: a steam turbine, a hard-coal-fired oxy-type pulverized fuel boiler, an air separation unit with a four-end-type high-temperature membrane and a carbon dioxide capture unit. The electrical power of the steam turbine is 600 MW, the live steam thermodynamic parameters are 650°C/30 MPa, and the reheated steam parameters are 670°C/6 MPa. First of all the net efficiency was calculated as functions of the oxygen recovery rate. The net efficiency was lower than the reference efficiency by 9–10.5pp, and a series of actions were thus proposed to reduce the loss of net efficiency. A change in the boiler structure produced an increase in the boiler efficiency of 2.5–2.74pp. The range of the optimal air compressor pressure ratio (19–23) due to the net efficiency was also determined. The integration of all installations with the steam turbine produced an increase in the gross electric power by up to 50.5 MW. This operation enabled the replacement of the steam regenerative heat exchangers with gas–water heat exchangers. As a result of these alterations, the net efficiency of the analyzed power plant was improved to 5.5pp less than the reference efficiency.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.