Abstract
Accessibility is seldom used as a performance measure when planning transit services. This study is conducted following introduction of new timetables intended to improve passenger throughput for Sydney’s transit services, but resulted in major delays throughout the system. Cumulative accessibility to jobs at 30-minute travel threshold before and after the timetable change are calculated between 8 and 9 am, to measure change in accessibility. The results show the person-weighted accessibility dropped by 3%, from 45,070 to 43,730, and 63.3% of the population’s access to jobs were adversely affected by timetable change. This study advocates for the inclusion of accessibility metrics into transit performance measures.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.