Abstract

Purpose: This study was done to develop a schematized alarm-managing manual for continuous renal replacement therapy (CRRT) and to investigate its effects in maintaining continuity in the patients’ treatment and promptly resolving alarms when CRRT is being carried out. Methods: Sixtynurses from two medical intensive care units (ICUs) (one experimental and one control) at one hospital were asked to answer a questionnaire including their CRRT nursing competency and satisfaction with the manual. Data on alarm resolution rate were collected by analyzing existing data, such as the details of each alarm and the number of resolutions around the clock in the CRRT device. Results: The alarm resolution rate and some of CRRT nursing competency scores in the experimental group were higher than those in the control group. The experimental group was also satisfied with the manual. Conclusion: The study confirmed that the schematized alarm-managing manual can be useful for ICU nurses to resolve alarms and can be used as a guideline. Application of this manual to clinical practices and its use can therefore, be encouraged through continuous educationand promotion.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.