Abstract
Surface charges can modify the elastic modulus of nanostructure, leading to the change of the phonon and thermal properties in semiconductor nanostructure. In this work, the influence of surface charges on the phonon properties and phonon thermal conductivity of GaN nanofilm are quantitatively investigated. In the framework of continuum mechanics, the modified elastic modulus can be derived for the nanofilm with surface charges. The elastic model is presented to analyze the phonon properties such as the phonon dispersion relation, phonon group velocity, density of states of phonons in nanofilm with the surface charges. The phonon thermal conductivity of nanofilm can be obtained by considering surface charges. The simulation results demonstrate that surface charges can significantly change the phonon properties and thermal conductivity in a GaN nanofilm. Positive surface charges reduce the phonon energy and phonon group velocity but increase the density of states of phonons. The surface charges can change the size and temperature dependence of phonon thermal conductivity of GaN nanofilm. Based on these theoretical results, one can adjust the phonon properties and temperature/size dependent thermal conductivity in GaN nanofilm by changing the surface charges.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have