Abstract

The mixed work assignment technique was applied to the modular production concept to solve the apparel assembly line balancing problem. Specifically, an algorithm was implemented to generate workstations by first classifying tasks into modules through an analysis of the manufacturing process and assigning grouped tasks in the single task–multiple workers and multiple tasks–single worker assignment methods. Then, worker assignment was sequentially performed considering the skill level of the worker. A simulation of producing 100 men’s shirts was performed. Owing to line balancing, the total production time was considerably lower than that reported in previous studies. The enhanced performance was attributable to the fact that unlike previous studies that limited the apparel assembly line balancing problem to worker assignment, line balancing was performed through both task and worker assignment in this study. The results demonstrated that task assignment must be considered in the design stage in the apparel assembly line balancing problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.