Abstract

Both the river network and the regions outside the estuary mouths in the Pearl River Delta (PRD) of China experienced significant changes from 1999 to 2014. A validated hydrodynamic model across the entire PRD and adjacent regions outside the estuary mouths is employed to simulate both present (circa 2014) and past conditions (circa 1999). The total net water flux of the PRD decreased. The flow division of the West River is increasing, with values of 3.63% and 4.66% for the Makou and Denglongshan sections, respectively. The flood flow division of the North River is correspondingly decreasing. The value of the flood levels significantly decreased (more than 2 m) in the upper portion of the PRD, moderately decreased in the middle of the PRD (more than 1.1 m) and slightly decreased in the bottom part of the PRD (less than 0.22 m). In addition, the effects of morphodynamic evolution in different regions (i.e., the river network, coastline and bathymetry changes outside the estuary mouth) on floods are quantified. The results indicate that the decreased net water flux was caused by the increased channel’s capacity and the gentler water-level profile from the downcutting riverbed of the river network. The uneven morphodynamic evolution of the riverbed of the river network was primarily responsible for changes in the flood flow division in the PRD, and morphological evolution outside the estuary mouth was primarily responsible for reallocation within the outlets. The downcutting riverbed in the river network was primarily responsible for the lower flood levels in the upper and middle portion of the PRD. Reclamation seemed to have barely affected the flood level. The deepening bathymetry outside the estuary mouth was mainly responsible for the decrease in the flood level in the bottom portion of the PRD. The downcutting riverbed may decrease the stability of the riverbank, increasing the flood risk. The morphodynamic evolution of both the river network and the regions outside the estuary mouth should be considered to avoid unwanted side effects when designing local projects and flood mitigation strategies for the PRD.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call