Abstract

Stream restoration efforts in the United States are increasingly aimed towards water quality improvement, yet little process-based guidance exists to compare pollutant removals from different restoration techniques for variable site conditions. Excess nitrate (NO3−) is a frequent pollutant of concern due to eutrophication in downstream waterbodies such as the Chesapeake Bay. We used MIKE SHE to simulate hydraulics and NO3− removal in a 90m restored reach of Stroubles Creek, a second-order stream in Blacksburg, Virginia. Site specific geomorphic, hydrologic, and hydraulic data were used to calibrate the model. We evaluated in-stream structures that induce hyporheic zone denitrification during baseflow and inset floodplains that remove NO3− during storm flows. We varied hydraulic conditions (winter baseflow, summer baseflow, storm flow), biogeochemical parameters (literature hyporheic zone denitrification rates and newly available inset floodplain removal rates) and boundary conditions (upstream NO3− concentration), sediment conditions (hydraulic conductivity), and stream restoration design parameters (inset floodplain length). Our results indicate that NO3− removal rates within the 90m reach were minimal. Structure-induced hyporheic zone denitrification did not exceed 3.1% of mass flowing in from the upstream channel, was achieved only during favorable background groundwater hydraulic conditions (i.e. summer baseflow), and was transport-limited such that non-trivial removal rates were achieved only when the streambed hydraulic conductivity (K) was at least 10−4m/s. Inset floodplain nitrogen removal was limited by floodplain residence time and NO3− removal rate, and did not exceed 1% of inflowing mass. Summing these removals for both restoration practices over the course of the year based on the frequency of storm and summer baseflow conditions yielded ∼2.1% annual removal. Achieving 30% NO3− removal required increasing the length of stream reach restored to 0.9km–819km (depending on hydraulic conductivity) and 3.8–46km (depending on inset floodplain length and nitrogen removal rate) for in-stream structures during baseflow and inset floodplains during storm flow, respectively. In one of the first comparisons of process-based modeling to the Chesapeake Bay Program stream restoration guidance, we found that the guidance overestimated hyporheic NO3− removal for our modeled reach, but correctly estimated inset floodplain removal. Overall, our results indicate that in-stream structures and inset floodplains can improve water quality, but overall required level of effort may be high to achieve desired results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.